Wednesday, June 30, 2010

Day 170: Plasterboard installation completed

Hi friends,

The remaining areas that requires plasterboards was completed today, the wet areas such as bathroom, ensuite, and laundry was installed with Aquacheck plasterboard which is a moisture resistance plasterboard and the rest of the house has the standard. I'm not sure why they didn't install the Aquacheck plasterboards to the kitchen and the main toilet area as these places is considered as wet areas. Anyway hopefully they will install the cornices tomorrow.

Ensuite: The Aquacheck plasterboard colour is sort of bluey grey colour

The bulkheads to the living room.

The fridge space and pantry (short one)
Kitchen: Can you see the colour difference between the Aquacheck and the standard plasterboard, the standard one are creamy/white colour while the Aquacheck is the bluey/grey colour. You can see the colour difference between the spare Aquacheck plasterboard leaning against the wall with the standard plasterboard installed. I believe they are suppose to install the Aquacheck to the kitchen wall where the sink are which is the panel underneath the window.
Hallway leading to the bathroom, laundry, toilet, and smaller bedrooms
Bathroom
Toilet: I believe they are suppose to install the Aquacheck plasterboard instead of the standard one.