Day 169: Plasterboards partially installed

Hi friends,

Things are starting to pick up with the plasterboards installed to the garage ceiling, all internal house ceiling, alfresco ceiling, entrance hallway, master bedroom, walk in robe, living room, and family room wall adjoining the bathroom, and fridge space. The remaining places that needs to be plastered are thebulkheads, ensuite walls, kitchen walls, bathroom walls, and back half of the house. If they work tomorrow the plastering should be completed. In addition, the fibre optic cabinet box was also installed.

Fibre optic cable cabinet installed
Master bedroom window Walk In Robe
Entrance hallway viewing from family room hallway
Living room
One of the incomplete living room bulkhead
Feature niche wall separating the living room and meal room
Entrance hallway linen viewing from living room Meal room viewing from family room
Kitchen
Family room