There's been more progress on our land today with the installation of the sewerage and storm water pipes. So thank you to our site supervisor for organising it. After looking at some of the pipes I noticed that they aren't that deep in the ground, they are probably about 30 cm or so deep. Anyway enjoy the pics and I will keep you all updated if further works are done.

The sewerage and drainage pipes sticking up around our land.


Ensuite - The one with the square bit on top is where the shower will be, the one near the wall is where the toilet will be, the middle one is where the double vanities will be, and the one with blue paint is one of the storm water pipes. I'm not sure of the little pipe but it could be a sewer vent.


Bathroom - The one with the square hat is where the shower will be, the two smaller pipes I assume the one in the middle is where the vanity will be, and the other one is where the bathtub will be. The small one at the back is where the laundry trough will be.

Looking from the ensuite the lot of pipes near the red brick house is where the kitchen will be, the lot of pipes in the middle is where the bathroom will be, the pipe closest to the house at the back is where the toilet will be and the faintly small pipe near the toilet at the back is the where the laundry trough will be.

2 comments:

  1. Looking good mate. Not too long until 'Miss Concrete Slab' arrives and really gets this party started :-)

    ReplyDelete
  2. Hi Paul,

    Thanks, I definitely throw a slab party once it's done 'Hmm BEER!'.

    ReplyDelete