Hello friends,
It looks like the garage brick wall has been completed so a job well done to the brickies. I was surprised that the bricking above the garage door was completed today because the steel lintel wasn't delivered yesterday so I didn't expect the steel lintel to be delivered and then installed straight away so a big thank you to my site supervisor for organising it perfectly. Anyway I'm relieved that the garage wall is completed and we can begin to move on to the next stage as I want the roof tiles installed as soon as possible so it could shield the timber frame from the weather but that won't happen until the brickies finish bricking the whole house so that would be another month time. I'm deeply concern about the quality of the timber frame because it have been subjected to the rain and sun for over 2 months now therefore I'm not sure how much longer it can withstand the elements before it loses its' structural strength. I will raise this concern at the frame stage inspection to my independent building inspector.
Bricking to the front of garage with the unexpected brick above garage door
The wall is just over 3 metres high because it's built on the site boundary.
No comments:
Post a Comment