Hi friends,
There was a surprise today with the exposed aggregate concrete poured to the driveway, porch and path to porch, we thought it would be done further towards the hand over period and didn't expect it be done this early but we are very happy that it was done so another item off the list. The negative to the concreting is that it doesn't look as good as we expected because the area between the porch and driveway is not level due to the porch being higher than the garage, oh well as long as the water is directed away from the house and garage than it's acceptable. The colour is standard black like the rest of the neighbourhood.
In addition, the tiler layed the tiles to the showerbases in the bathroom and ensuite. Our site supervisor is powering things along so a big thank you to him for his work.