The remaining roof gutters and fascia's for the left side of house, above the portico, and the above the garage door was installed today however they still need to install the roof gutter above the garage right side wall.
It's been over 3 months and they still haven't installed roof tiles. I am quite concerned about the length of time the timber frame have been exposed to the weather however I was advise that the roof tiles should begin on Monday or Tuesday so hopefully it will be.